| Click on a picture for a larger image |
|
  |
Top-left fairing mounting bolt
|
|
  |
Lower fairing support arm (The tips bend towards the front of the bike). Note that the end are inside the upper fairing half
|
|
  |
Rubbing down the upper fairing half (with 2000 grit paper at this point)
|
|
  |
Working on polishing the tank
|
|
  |
The completed tank with ne decals and seals forthe filler cap
|
|
  |
After polishing the upper fairing half
|
|
  |
The side stand refitted.
|
|
  |
Afer refitting the turn signals.
|